Access Road after Casting
Bund, Prior to Melting Formers
Casting to Channel Tunnel Site Village
Coastal Access before Topsoiling
Drain Channel before Topsoiling
Drainage Channel Construction prior to Topsoiling
Early Germination to Drain Channel
Early Germination to River Embankment
Early Grass Growth in Car Park
Early Growth to Access Road
Early Growth to River Embankment
Early Growth to Water Teatment Plant Access
Gravel Fill to Waterline, Upper Slopes yet to be Topsoiled
Gravel Filling to Waterline before Topsoiling
Lake Embankment prior to Melting Formers
Motorway Emergency Running Lane
Oversoiling to Flood Channel
Replacing Masonry Units with Grasscrete
Replacing Masonry Units with Grasscrete
Reservoir Construction 1970's Style
River Embankment, Sub-Grade Preparation
Using Re-Cycled Materials For Sub-Base
Verge Hardening pouring Brown Coloured Concrete
Verge Hardening, Granular Sub-Base
Verge Hardening, Melting Formers in Brown Concrete
Wentworth Golf, Erecting Edge Formwork
Wentworth Golf, Laying Out Formers
Work in Progress to Flood Storage Pond